1/16/2023 – As the station grows and matures, there is always work to be done!
This evening I accomplished some improvement items in the shack for position C, to enable more efficient in-band Search & Pounce integration with position B
- Installed Y-Box on K3 at position C
- Built cable to connect EA4TX Interlock to Y-Box at position C
- Built cable to connect Top Ten Band Decoder to Y-Box at position C
- Built cable to connect Top Ten Band Decoder to Dunestar 600 bandpass filter at position C
- Tested the function of Y-Box, Interlock, Band Decoder, and Dunestar at position C
1/18/2023 – I made six laminated N1MM+ “help” cards, containing many key assignments and some cool macro commands. They are printed on both sides, with unique data on each side. The MS-Word file is available here.